Batting stats

Most Runs
Download as PDF  Download as CSV  Download as Excel Print 
# Player Group Team Mat Inns NO Runs 4's 6's 50's 100's HS SR Avg
1 B UTILITY A 4 4 1 227 19 20 3 0 91 218.27 75.67
2 B LAB 6 6 0 150 14 9 0 0 46 111.11 25.00
3 A INSTRUMENTATION 5 4 1 144 6 16 0 1 106 211.76 48.00
4 B KARP Operation 3 3 0 123 14 6 1 0 58 128.12 41.00
5 B P3A Operation 4 4 1 121 8 7 0 0 40 147.56 40.33
6 B KARP Operation 4 4 1 118 8 11 1 0 92 178.79 39.33
7 A MECHANICAL XI 6 5 0 115 12 6 0 0 38 185.48 23.00
8 B LAB 6 6 0 109 10 5 0 0 45 119.78 18.17
9 A KARP-II Control Room 5 5 1 107 4 7 1 0 50 159.70 26.75
10 B P3A Operation 6 4 0 106 3 12 1 0 60 235.56 26.50
11 A MECHANICAL XI 4 3 0 105 9 9 0 0 37 214.29 35.00
12 A MECHANICAL XI 5 5 1 91 6 6 0 0 37 140.00 22.75
13 B P3A Operation 6 6 1 91 9 3 0 0 30 115.19 18.20
14 B LAB 6 6 1 88 7 7 0 0 37 162.96 17.60
15 B Real Operation PMG 5 5 1 86 10 3 0 0 40 134.38 21.50
16 A INRPK Electrical 5 5 0 84 8 1 1 0 53 96.55 16.80
17 A UTILITY B 2 2 0 79 3 10 1 0 78 239.39 39.50
18 A INRPK Electrical 5 5 1 79 6 6 1 0 55 127.42 19.75
19 A MECHANICAL XI 4 3 1 79 10 4 0 0 30 123.44 39.50
20 A INSTRUMENTATION 5 3 0 72 7 4 0 0 48 156.52 24.00
21 B UTILITY A 6 5 2 72 7 3 0 0 35 138.46 24.00
22 B P3A Operation 6 4 1 69 4 4 0 0 27 150.00 23.00
23 A INSTRUMENTATION 3 3 1 63 4 3 1 0 61 131.25 31.50
24 A MECHANICAL XI 2 2 1 57 6 3 1 0 50 183.87 57.00
25 B KARP Operation 3 3 0 57 3 4 0 0 31 142.50 19.00
26 A KARP-II Control Room 5 5 1 57 4 3 0 0 27 132.56 14.25
27 B UTILITY A 6 4 1 57 4 2 0 0 47 107.55 19.00
28 A KARP-II Control Room 4 4 0 57 4 0 0 0 31 98.28 14.25
29 B UTILITY A 6 5 1 52 5 2 0 0 22 123.81 13.00
30 B Real Operation PMG 5 5 0 51 3 2 0 0 27 94.44 10.20
31 B LAB 4 4 0 50 4 3 0 0 31 131.58 12.50
32 B Real Operation PMG 4 4 1 50 1 1 0 0 30 106.38 16.67
33 B Real Operation PMG 4 4 1 48 1 4 0 0 29 133.33 16.00
34 A UTILITY B 4 4 1 46 6 0 0 0 31 97.87 15.33
35 A KARP-II Control Room 5 5 0 42 3 3 0 0 17 110.53 8.40
36 B LAB 6 6 1 42 5 2 0 0 18 110.53 8.40
37 B UTILITY A 5 3 1 41 2 2 0 0 23 102.50 20.50
38 B UTILITY A 5 5 1 37 2 4 0 0 17 132.14 9.25
39 A MECHANICAL XI 5 4 3 37 3 2 0 0 25 105.71 37.00
40 B Real Operation PMG 5 4 0 37 0 4 0 0 32 100.00 9.25
41 A UTILITY B 3 3 1 35 5 1 0 0 33 106.06 17.50
42 A INRPK Electrical 5 5 0 35 4 0 0 0 15 64.81 7.00
43 B UTILITY A 5 2 1 34 1 3 0 0 29 154.55 34.00
44 B LAB 6 6 2 34 3 0 0 0 22 75.56 8.50
45 B KARP Operation 4 4 2 30 5 0 0 0 28 187.50 15.00
46 B P3A Operation 5 5 2 29 1 2 0 0 12 138.10 9.67
47 A INSTRUMENTATION 5 4 1 29 2 0 0 0 17 76.32 9.67
48 A INSTRUMENTATION 5 4 1 28 0 4 0 0 20 147.37 9.33
49 A INRPK Electrical 4 4 0 26 4 1 0 0 14 130.00 6.50
50 A KARP-II Control Room 3 3 0 26 2 0 0 0 20 113.04 8.67
51 B P3A Operation 4 2 1 25 3 0 0 0 22 125.00 25.00
52 A INRPK Electrical 2 2 2 22 2 1 0 0 12 137.50 --
53 B Real Operation PMG 5 3 0 22 0 3 0 0 21 137.50 7.33
54 A MECHANICAL XI 3 3 1 22 2 1 0 0 14 104.76 11.00
55 B Real Operation PMG 2 2 0 22 1 2 0 0 14 104.76 11.00
56 A KARP-II Control Room 4 4 2 22 1 1 0 0 8 104.76 11.00
57 A INSTRUMENTATION 4 4 2 22 0 1 0 0 10 81.48 11.00
58 A INSTRUMENTATION 5 3 0 22 2 0 0 0 15 75.86 7.33
59 A INRPK Electrical 5 4 0 22 0 0 0 0 13 62.86 5.50
60 B UTILITY A 3 2 2 20 1 0 0 0 17 166.67 --
61 B KARP Operation 3 3 1 20 1 1 0 0 17 133.33 10.00
62 A MECHANICAL XI 4 2 0 19 1 1 0 0 16 111.76 9.50
63 B P3A Operation 6 4 1 19 2 0 0 0 12 73.08 6.33
64 A MECHANICAL XI 5 3 0 18 2 0 0 0 10 81.82 6.00
65 B Real Operation PMG 5 4 1 17 2 1 0 0 16 89.47 5.67
66 A UTILITY B 4 4 1 17 2 0 0 0 12 65.38 5.67
67 B P3A Operation 6 3 0 17 0 0 0 0 8 48.57 5.67
68 B Real Operation PMG 4 4 2 16 1 1 0 0 7 100.00 8.00
69 A INRPK Electrical 5 5 1 16 2 0 0 0 10 66.67 4.00
70 B UTILITY A 6 3 1 15 2 1 0 0 14 150.00 7.50
71 A INSTRUMENTATION 4 2 2 15 3 0 0 0 14 150.00 --
72 A UTILITY B 2 1 1 15 3 0 0 0 15 136.36 --
73 A MECHANICAL XI 1 1 0 15 1 1 0 0 15 125.00 15.00
74 A KARP-II Control Room 5 5 1 15 1 0 0 0 6 71.43 3.75
75 A UTILITY B 2 2 1 15 1 0 0 0 15 68.18 15.00
76 A UTILITY B 4 3 0 15 0 1 0 0 9 65.22 5.00
77 B LAB 4 3 0 14 1 1 0 0 9 140.00 4.67
78 B LAB 5 4 1 14 0 1 0 0 8 73.68 4.67
79 A MECHANICAL XI 5 5 1 14 1 0 0 0 7 63.64 3.50
80 A UTILITY B 2 2 0 14 1 1 0 0 10 60.87 7.00
81 B Real Operation PMG 2 2 1 13 0 0 0 0 9 81.25 13.00
82 B UTILITY A 6 2 0 13 0 0 0 0 9 76.47 6.50
83 B Real Operation PMG 2 2 1 13 0 0 0 0 7 61.90 13.00
84 A KARP-II Control Room 4 3 1 11 1 0 0 0 6 61.11 5.50
85 A UTILITY B 3 3 0 11 0 0 0 0 5 61.11 3.67
86 A UTILITY B 2 2 0 10 0 0 0 0 9 43.48 5.00
87 B P3A Operation 5 3 1 9 0 0 0 0 6 81.82 4.50
88 A UTILITY B 2 2 0 9 1 0 0 0 8 75.00 4.50
89 B KARP Operation 3 2 0 9 1 0 0 0 9 69.23 4.50
90 A KARP-II Control Room 3 3 1 9 0 0 0 0 6 64.29 4.50
91 B KARP Operation 1 1 0 9 0 0 0 0 9 60.00 9.00
92 A KARP-II Control Room 4 4 1 8 0 0 0 0 7 72.73 2.67
93 B P3A Operation 3 2 1 8 0 0 0 0 5 61.54 8.00
94 B LAB 5 5 0 8 1 0 0 0 4 44.44 1.60
95 A INSTRUMENTATION 2 2 0 8 0 0 0 0 8 42.11 4.00
96 A INRPK Electrical 3 3 2 7 0 0 0 0 4 63.64 7.00
97 A INRPK Electrical 2 2 0 7 0 0 0 0 6 35.00 3.50
98 A KARP-II Control Room 1 1 0 5 1 0 0 0 5 250.00 5.00
99 B KARP Operation 4 3 0 5 0 0 0 0 3 33.33 1.67
100 A INSTRUMENTATION 3 2 1 4 1 0 0 0 4 36.36 4.00
101 B KARP Operation 4 1 1 3 0 0 0 0 3 75.00 --
102 A INSTRUMENTATION 4 1 1 3 0 0 0 0 3 60.00 --
103 A MECHANICAL XI 2 1 1 3 0 0 0 0 3 50.00 --
104 B KARP Operation 3 2 1 3 0 0 0 0 2 50.00 3.00
105 B UTILITY A 5 2 0 3 0 0 0 0 2 42.86 1.50
106 A UTILITY B 2 2 0 3 0 0 0 0 2 27.27 1.50
107 A KARP-II Control Room 3 3 0 3 0 0 0 0 2 20.00 1.00
108 B KARP Operation 1 1 1 2 0 0 0 0 2 50.00 --
109 A INRPK Electrical 5 3 1 2 0 0 0 0 1 33.33 1.00
110 A MECHANICAL XI 2 1 1 1 0 0 0 0 1 100.00 --
111 A UTILITY B 1 1 1 1 0 0 0 0 1 100.00 --
112 B LAB 1 1 1 1 0 0 0 0 1 50.00 --
113 B Real Operation PMG 1 1 0 1 0 0 0 0 1 50.00 1.00
114 B LAB 1 1 1 1 0 0 0 0 1 50.00 --
115 A MECHANICAL XI 2 1 0 1 0 0 0 0 1 33.33 1.00
116 B LAB 2 2 2 1 0 0 0 0 1 25.00 --
117 B P3A Operation 4 3 0 1 0 0 0 0 1 20.00 0.33
118 A INRPK Electrical 3 2 0 1 0 0 0 0 1 16.67 0.50
119 A MECHANICAL XI 2 1 0 1 0 0 0 0 1 16.67 1.00
120 A KARP-II Control Room 5 2 0 1 0 0 0 0 1 14.29 0.50
121 A INRPK Electrical 2 2 0 1 0 0 0 0 1 7.69 0.50